Create a bespoke document in minutes, 聽or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership聽of your information
Contractor Method Statement
"I need a Contractor Method Statement for a high-rise construction project in Jakarta, Indonesia, focusing on structural steel installation work to be carried out between March and June 2025, with particular emphasis on working at height safety procedures and crane operations."
1. Project Information: Details of the project, location, main contractor, and client information
2. Scope of Works: Detailed description of the specific construction activities covered by this method statement
3. Resource Requirements: List of personnel, equipment, materials, and tools required for the work
4. Work Methodology: Step-by-step description of how the work will be carried out, including sequence of activities
5. Risk Assessment: Identification of potential hazards and control measures specific to the work activities
6. Safety Requirements: Specific safety measures, PPE requirements, and safety protocols to be followed
7. Environmental Controls: Measures to protect the environment and manage waste during work activities
8. Quality Control Measures: Procedures for ensuring work meets required quality standards and specifications
9. Emergency Procedures: Response procedures for potential emergency situations
10. Supervision and Monitoring: Details of supervision arrangements and how work will be monitored
1. Permits and Licenses: Section detailing specific permits required - include when working in regulated areas or with special activities
2. Traffic Management: Include when work affects public roads or site traffic flow
3. Noise Control Measures: Required when working in noise-sensitive areas or during restricted hours
4. Interface Management: Include when work interfaces with other contractors or existing operations
5. Special Training Requirements: Add when work requires specific certifications or specialized training
6. Cultural/Heritage Protection: Include when working near cultural sites or in heritage-sensitive areas
1. Risk Assessment Matrix: Detailed risk assessment tables and matrices
2. Site Layout Plans: Drawings showing work areas, access points, and safety arrangements
3. Equipment Specifications: Technical specifications of major equipment to be used
4. Safety Data Sheets: MSDS for any hazardous materials to be used
5. Inspection Checklists: Forms for daily checks and safety inspections
6. Emergency Contact List: List of key contacts for emergency situations
7. Training Records: Copies of relevant training certificates and competency records
8. Method Statement Briefing Record: Form for recording worker briefings on the method statement
Authors
Construction
Infrastructure Development
Mining
Oil and Gas
Manufacturing
Industrial Development
Commercial Development
Residential Development
Transportation
Utilities
Telecommunications
Energy
Operations
Health and Safety
Project Management
Quality Assurance
Engineering
Construction
Risk Management
Compliance
Environmental
Technical Services
Project Manager
Construction Manager
Health and Safety Manager
Site Supervisor
Quality Control Manager
Environmental Compliance Officer
Risk Assessment Specialist
Construction Engineer
Project Engineer
Safety Officer
Operations Manager
Technical Director
Construction Superintendent
Compliance Manager
Site Manager
Find the exact document you need
Contractor Method Statement
A detailed work methodology and safety procedure document compliant with Indonesian construction regulations, outlining specific construction activities and their safe execution methods.
Method Statement For Cutting Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Indonesian construction regulations.
Method Statement For Column Formwork
An Indonesian-compliant technical document detailing procedures and safety requirements for column formwork installation in construction projects.
Method Statement For Demolition Of Concrete Slab
A technical document compliant with Indonesian regulations that outlines the safe methodology for concrete slab demolition, including safety measures and environmental controls.
Download our whitepaper on the future of AI in Legal
骋别苍颈别鈥檚 Security Promise
Genie is the safest place to draft. Here鈥檚 how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; 骋别苍颈别鈥檚 AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a 拢1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our for more details and real-time security updates.
Read our Privacy Policy.