Your data doesn't train Genie's AI
You keep IP ownershipΒ of your information
1. Document Control Information: Project details, document reference numbers, revision history, and approval status
2. Project Information: Site location, project scope, duration, and key contacts
3. Scope of Works: Detailed description of the work activities covered by this RAMS
4. Personnel and Responsibilities: List of all personnel involved, their roles, responsibilities, and required competencies
5. Risk Assessment Methodology: Explanation of risk assessment approach, scoring system, and risk matrix used
6. Hazard Identification and Risk Assessment: Detailed analysis of all potential hazards and their associated risks, including control measures
7. Method Statement: Step-by-step description of how the work will be carried out safely
8. Equipment and Materials: List of all equipment, tools, and materials to be used, including safety specifications
9. Personal Protective Equipment (PPE): Detailed requirements for PPE for different activities
10. Emergency Procedures: Emergency response plans, first aid arrangements, and emergency contact information
11. Environmental Protection Measures: Controls to protect the environment during work activities
12. Communication and Reporting: Communication protocols, reporting procedures, and documentation requirements
1. Permit to Work Requirements: Details of any required work permits, used when working in high-risk or controlled areas
2. Specialized Training Requirements: Additional training needs, included when work requires specific certifications or skills
3. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic flow
4. Noise and Vibration Control: Included when work involves significant noise or vibration impacts
5. Working at Height Procedures: Detailed procedures required when work involves activities at height
6. Confined Space Entry Procedures: Required when work involves entering confined spaces
7. Lifting Operations: Included when work involves crane or mechanical lifting operations
8. Hot Work Procedures: Required when work involves welding, cutting, or other hot work
9. Temporary Works Assessment: Included when temporary structures or supports are required
1. Risk Assessment Matrix: Detailed risk assessment scoring matrix and methodology
2. Site Layout Plans: Maps and drawings showing work areas, access points, and safety features
3. Equipment Inspection Checklists: Forms for equipment and tool inspections
4. PPE Inspection Forms: Checklists for PPE inspection and maintenance
5. Emergency Contact List: Comprehensive list of emergency contacts and procedures
6. Training Records: Copies of relevant training certificates and competency records
7. Method Statement Briefing Record: Form to record worker briefings on the method statement
8. Daily Activity Briefing Template: Template for daily safety briefings
9. Incident Report Forms: Templates for reporting accidents, incidents, and near misses
10. Safety Data Sheets: MSDS/SDS for any hazardous materials to be used
Construction
Infrastructure Development
Manufacturing
Mining
Oil and Gas
Telecommunications
Power Generation
Real Estate Development
Chemical Industry
Transportation
Renewable Energy
Industrial Installation
Waste Management
Utilities
Health Safety Environment (HSE)
Operations
Project Management
Quality Assurance
Engineering
Site Operations
Risk Management
Compliance
Technical Services
Environmental Management
Construction Management
Field Operations
Quality Control
Safety Compliance
Project Planning
Project Manager
Health and Safety Manager
Site Supervisor
Construction Manager
Risk Assessment Specialist
Safety Officer
Environmental Compliance Officer
Operations Manager
Quality Control Manager
Civil Engineer
Mechanical Engineer
Electrical Engineer
Site Engineer
Project Coordinator
Construction Superintendent
HSE Consultant
Compliance Manager
Technical Director
Work Supervisor
Safety Inspector
Find the exact document you need
Low Voltage Directive Risk Assessment
A technical safety assessment for low voltage electrical equipment compliance under Indian regulations and standards.
Liquidity Risk Assessment
A regulatory-compliant assessment of an organization's liquidity risk profile and management framework under Indian banking regulations and RBI guidelines.
Mobile Catering Risk Assessment
A regulatory-compliant risk assessment document for mobile catering operations in India, covering food safety, operational hazards, and control measures.
Medical Risk Assessment
An India-compliant medical risk assessment document for systematic evaluation and documentation of patient health risks, following national healthcare regulations and standards.
Information Technology Risk Assessment
An agreement for IT Risk Assessment services governed by Indian law, outlining assessment scope, methodology, and compliance requirements.
Information Security Risk Assessment Report
A comprehensive evaluation of an organization's information security risks and controls, compliant with Indian cybersecurity laws and regulations, providing detailed findings and recommendations for risk mitigation.
Double Glazing Risk Assessment
An Indian-compliant risk assessment document for double glazing installation and maintenance, addressing safety requirements under Indian building and workplace safety regulations.
Emergency Risk Assessment
A comprehensive emergency risk evaluation document compliant with Indian regulations, designed to identify and address potential emergency situations within organizations.
Emergency Response Risk Assessment
A comprehensive emergency risk evaluation and response planning document compliant with Indian safety and disaster management regulations.
Cyber Security Assessment
An Indian law-governed agreement for conducting professional cybersecurity assessment services, aligned with IT Act requirements and CERT-In guidelines.
Coshh Risk Assessment Form
A hazardous substance risk assessment document aligned with Indian workplace safety regulations, based on COSHH principles for managing dangerous materials in the workplace.
Continuous Risk Assessment
An India-compliant framework document establishing procedures and requirements for ongoing organizational risk assessment and management processes.
Community Event Risk Assessment
An Indian-compliant risk assessment document for community events, addressing safety, emergency procedures, and regulatory requirements under Indian law.
Client Risk Assessment Questionnaire
A regulatory-compliant questionnaire for assessing client risk profiles under Indian financial regulations, incorporating SEBI and RBI guidelines.
Business Risk Assessment
A structured evaluation of business risks and mitigation strategies, compliant with Indian corporate governance requirements and regulatory framework.
Broken Leg Risk Assessment
A workplace safety assessment document for identifying and mitigating leg injury risks, compliant with Indian safety regulations and workplace safety codes.
Baseline Risk Assessment For Road (Construction)
A mandatory risk assessment document under Indian law that evaluates and addresses potential hazards and safety measures in road construction projects.
Baseline Risk Assessment For Building (Construction)
A comprehensive construction risk assessment document aligned with Indian building safety regulations and construction laws, providing systematic hazard evaluation and mitigation strategies.
Warehouse Fire Risk Assessment
A technical assessment document evaluating fire risks in warehouse facilities and recommending safety measures under Indian regulatory requirements.
Abc Risk Assessment
A detailed evaluation of organization's anti-bribery and corruption risks under Indian law, including risk assessment findings and mitigation recommendations.
Abac Risk Assessment
An ABAC system security and compliance risk assessment document aligned with Indian IT laws and international security standards.
Vendor Security Assessment
A comprehensive vendor security assessment framework aligned with Indian IT laws and regulations, designed to evaluate vendor security controls and compliance status.
Software Validation Risk Assessment
A technical-legal document for software validation risk assessment and mitigation in compliance with Indian regulations and IT industry standards.
Remote Access Risk Assessment
A risk assessment document for evaluating remote access systems and infrastructure, aligned with Indian cybersecurity regulations and industry best practices.
Risk Management Audit Report
A comprehensive evaluation of an organization's risk management framework and controls, compliant with Indian regulatory requirements and professional standards.
Risk Assessment Science Experiment
A legal document under Indian jurisdiction that provides comprehensive risk assessment and safety protocols for scientific experiments, ensuring regulatory compliance and safety standards.
Risk Assessment Methodology
A comprehensive risk assessment methodology document aligned with Indian regulatory requirements and industry best practices.
Risk Assessment For Stall Holders
A regulatory-compliant risk assessment template for stall holders in India, covering operational safety and liability requirements under Indian law.
Risk Assessment Executive Summary
A concise overview of organizational risk assessment findings and recommendations, compliant with Indian regulatory requirements and corporate governance standards.
Risk Assessment Cyber Security
A comprehensive cybersecurity risk assessment document compliant with Indian regulations, evaluating organizational cyber risks and providing mitigation strategies.
Outdoor Event Fire Risk Assessment
An Indian regulatory-compliant fire risk assessment template for outdoor events, covering hazard identification, control measures, and emergency procedures.
Risk Maturity Assessment Report
An evaluation document used in India to assess and report on an organization's risk management maturity level, compliance, and improvement opportunities.
Risk Evaluation Form
An Indian-compliant Risk Evaluation Form for systematic workplace hazard identification and risk assessment, aligned with national safety regulations.
Risk Assessment Matrix Oil And Gas
A structured risk assessment framework for oil and gas operations in India, providing comprehensive guidelines for risk identification, evaluation, and management in compliance with national regulations.
Quality Risk Assessment SOP
A Standard Operating Procedure for quality risk assessment processes compliant with Indian regulatory requirements and international quality standards.
Risk Assessment SOP
A standardized procedure document for workplace risk assessment and management in compliance with Indian safety regulations and industry standards.
Security Risk Assessment Report
A comprehensive security risk evaluation document that assesses vulnerabilities and provides risk mitigation recommendations, compliant with Indian IT and data protection regulations.
Risk Assessment Questionnaire For Banks
A comprehensive risk assessment questionnaire for Indian banks, aligned with RBI regulations and banking standards, for evaluating multiple risk categories.
Risk Assessment Letter
A formal risk evaluation document prepared under Indian law that identifies and analyzes potential risks while providing professional recommendations for risk mitigation.
Risk Analysis Form
An India-compliant Risk Analysis Form for comprehensive risk assessment and management, aligned with local regulatory requirements.
Rapid Risk Assessment
An expedited risk evaluation and mitigation planning document compliant with Indian safety and environmental regulations, designed for quick assessment and management of operational risks.
Matter Risk Assessment Form
An internal risk assessment document used by legal professionals in India to evaluate and document potential risks associated with new matters or clients, ensuring compliance with Indian legal requirements.
Compressed Air Risk Assessment
An Indian regulatory-compliant risk assessment document for evaluating safety considerations in compressed air systems, following The Factories Act 1948 and related regulations.
Risk Self Assessment
A structured risk self-assessment document compliant with Indian regulatory requirements, designed for comprehensive organizational risk evaluation and management.
Risk Assessment Log
A structured document for identifying and managing operational risks, compliant with Indian regulatory requirements and risk management standards.
Remote Working Risk Assessment
A risk assessment framework for remote working arrangements in India, ensuring compliance with local labor, safety, and data protection laws while providing comprehensive risk mitigation strategies.
Patient Manual Handling Risk Assessment
A comprehensive risk assessment framework for patient manual handling in Indian healthcare settings, ensuring compliance with local regulations and safety standards.
Latex Risk Assessment
A regulatory-compliant latex risk assessment document under Indian law, outlining latex hazard evaluation, control measures, and safety protocols.
Indoor Event Risk Assessment
A structured risk assessment template for indoor events in India, ensuring compliance with national and state-level safety regulations while identifying and mitigating potential hazards.
Electrical Design Risk Assessment
A technical safety document assessing electrical design risks and compliance with Indian electrical regulations and standards.
Risk Assessment Security
A comprehensive security risk assessment document compliant with Indian regulations, evaluating organizational security risks and providing mitigation strategies.
Vibration Risk Assessment
A technical assessment document evaluating workplace vibration exposure risks and control measures in compliance with Indian regulations and standards.
Stairs Risk Assessment
An Indian jurisdiction-compliant risk assessment document for evaluating and ensuring stair safety in buildings, aligned with national building codes and safety regulations.
Facility Security Assessment
A detailed facility security evaluation document compliant with Indian regulations that assesses physical, technical, and operational security measures.
Broken Arm Risk Assessment
A regulatory-compliant workplace safety assessment document for identifying and mitigating arm injury risks under Indian safety legislation.
Cleaning Validation Risk Assessment
A risk assessment framework for cleaning validation processes in manufacturing facilities, compliant with Indian regulatory requirements and GMP standards.
Demolition Risk Assessment
A legally-compliant risk assessment document under Indian law that outlines hazards, safety measures, and protocols for demolition activities.
Roofing Risk Assessment
An Indian regulatory compliance document assessing safety risks and control measures for roofing work, aligned with national construction and workplace safety standards.
Nonprofit Risk Assessment
A comprehensive risk assessment framework for Indian nonprofits, ensuring compliance with local regulations while identifying and mitigating organizational risks.
Electronic Banking Risk Assessment
A regulatory-compliant risk assessment document for electronic banking operations in India, addressing technological, operational, and security risks under RBI guidelines.
Excavator Risk Assessment
A comprehensive risk assessment document for excavator operations in India, ensuring compliance with national safety regulations and construction laws.
Building Security Risk Assessment
A comprehensive security risk evaluation document for buildings and facilities in India, providing analysis and recommendations while ensuring compliance with Indian regulations and security standards.
Project Assessment Matrix
A structured project evaluation framework compliant with Indian regulations, designed to systematically assess project viability across multiple dimensions.
Risk Assessment For Grass Cutting And Strimming
Risk assessment template for grass cutting and strimming operations, aligned with Indian safety regulations and workplace requirements.
Coal Mining Risk Assessment Report
A mandatory technical assessment report under Indian mining regulations that evaluates risks and safety measures in coal mining operations.
Supplier Security Assessment Questionnaire
An Indian jurisdiction-compliant questionnaire for assessing suppliers' security controls, compliance measures, and risk management practices.
Modern Slavery Risk Assessment
A structured assessment tool for identifying and addressing modern slavery risks in organizational operations and supply chains under Indian law.
Diesel Coshh Assessment
A hazardous substance risk assessment for diesel fuel handling and storage, compliant with Indian workplace safety and environmental regulations.
Baseline Risk Assessment
A comprehensive risk evaluation document compliant with Indian safety regulations that identifies and assesses workplace hazards and establishes risk control measures.
Vulnerability Assessment Matrix
A structured document used in India for systematically assessing and documenting IT security vulnerabilities, aligned with local cybersecurity regulations and CERT-In guidelines.
Method Statement And Risk Assessment For Landscaping
An Indian law-compliant document detailing safe landscaping procedures and risk mitigation measures for landscaping operations.
Cloud Computing Risk Assessment
A risk assessment document for cloud computing implementations that ensures compliance with Indian regulations and identifies technical, operational, and legal risks.
Hospitality Risk Assessment
A comprehensive risk assessment template for Indian hospitality establishments, ensuring compliance with national and state-level safety and operational regulations.
Procurement Risk Assessment Matrix
A risk assessment framework for procurement activities in India, ensuring compliance with local regulations while managing procurement-related risks.
Vulnerable Person Risk Assessment
A comprehensive risk assessment document for vulnerable persons in India, compliant with national legislation and designed to identify and manage various risk factors while establishing appropriate safeguards.
Training Risk Assessment
An Indian jurisdiction-compliant document for assessing and mitigating risks associated with workplace training activities.
Asset Criticality Assessment
An Indian law-governed document that assesses and ranks organizational assets based on their operational importance, risk impact, and regulatory compliance requirements.
Financial Crime Risk Assessment
A structured evaluation of financial crime risks and controls within an organization, aligned with Indian regulatory requirements and compliance standards.
Tile Manual Handling Risk Assessment
An Indian-law compliant risk assessment document for safe manual handling of tiles in workplace settings.
Startup Risk Assessment
A comprehensive risk assessment framework for Indian startups, covering regulatory, operational, financial, and strategic risk factors under Indian jurisdiction.
Site Specific Risk Assessment And Method Statement
A legally required safety planning document under Indian regulations that combines site-specific risk assessment with detailed work procedures to ensure safe project execution.
Solar Pv Risk Assessment
A technical risk assessment document for solar PV installations in India, covering regulatory compliance and risk mitigation strategies under Indian law.
Bank Compliance Risk Assessment
A structured assessment of banking compliance risks and controls under Indian regulatory framework, particularly RBI guidelines.
Road Risk Assessment
An Indian legal document for comprehensive road safety and risk assessment, following IRC guidelines and national safety standards.
Risk Maturity Assessment
An Indian jurisdiction agreement for conducting organizational Risk Maturity Assessment, outlining assessment methodology and compliance requirements.
Data Privacy Risk Assessment
A structured evaluation of organizational data privacy practices and compliance with Indian data protection laws, including risk assessment and recommendations.
Raw Material Supplier Risk Assessment
An Indian jurisdiction-compliant document for assessing and evaluating risks associated with raw material suppliers, ensuring regulatory and operational compliance.
Radiography Risk Assessment
An Indian regulatory-compliant risk assessment document for industrial radiography operations, addressing radiation safety requirements under AERB guidelines.
Nursery Childcare Risk Assessment
A risk assessment framework for Indian nursery and childcare facilities, ensuring compliance with national safety regulations while providing practical safety management guidelines.
Compliance Risk Assessment Questionnaire
An India-focused compliance risk assessment tool for evaluating organizational adherence to local regulatory requirements and identifying potential compliance risks.
Manual Handling Tile Risk Assessment
A risk assessment document for manual tile handling operations, compliant with Indian safety regulations, designed to identify and control workplace hazards.
Manual Handling Risk Assessment Tool
An India-compliant risk assessment tool for evaluating and managing workplace manual handling operations under OSH Code 2020.
Manual Handling Assessment Chart
An Indian-compliant risk assessment tool for evaluating manual handling operations and implementing safety measures in accordance with local workplace safety regulations.
Lift Plan Risk Assessment
A mandatory risk assessment document for lifting operations in India, combining technical specifications and safety protocols in compliance with Indian workplace safety regulations.
Last Minute Risk Assessment
An Indian jurisdiction-compliant document for conducting immediate pre-task safety evaluations and risk mitigation planning in workplace environments.
Laser Risk Assessment
A mandatory safety assessment document under Indian regulations that evaluates and controls risks associated with laser equipment and operations.
Infrastructure Risk Assessment
A comprehensive risk assessment document for infrastructure projects under Indian jurisdiction, analyzing environmental, structural, operational, and financial risks with mitigation strategies.
Glass And Hard Plastic Risk Assessment
A regulatory-compliant risk assessment document for glass and hard plastic hazards in Indian industrial settings, following local safety standards and protocols.
³±π²ΤΎ±±πβs Security Promise
Genie is the safest place to draft. Hereβs how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ³±π²ΤΎ±±πβs AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it