ֱ

Cofferdam Construction Method Statement Template for Malaysia

A comprehensive technical document governed by Malaysian construction and safety regulations that details the methodology, safety measures, and procedures for constructing and maintaining a cofferdam structure. The document adheres to requirements set by the Department of Occupational Safety and Health (DOSH), Construction Industry Development Board (CIDB), and relevant Malaysian standards. It includes detailed construction sequences, risk assessments, environmental protection measures, and emergency procedures specific to temporary water retention structures used in construction projects.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With ֱ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Cofferdam Construction Method Statement?

The Cofferdam Construction Method Statement is a critical document required for any construction project in Malaysia involving temporary water retention structures. It must be prepared in accordance with Malaysian legislation including the Occupational Safety and Health Act 1994, Factories and Machinery Act 1967, and Environmental Quality Act 1974. This document is essential for obtaining necessary permits and approvals from authorities such as DOSH and DOE. The method statement details construction methodology, safety protocols, environmental protection measures, and emergency procedures. It serves as both a technical guide for construction teams and a compliance document for regulatory authorities, ensuring that cofferdam construction meets all safety and quality requirements under Malaysian law.

What sections should be included in a Cofferdam Construction Method Statement?

1. Document Control: Document revision history, distribution list, and approval details

2. Project Overview: Brief description of the project, location, and scope of cofferdam works

3. Reference Documents: List of applicable standards, codes, and regulations being followed

4. Site Information: Detailed site conditions, ground investigation data, and environmental considerations

5. Design Parameters: Technical specifications, loading conditions, and design criteria for the cofferdam

6. Resource Requirements: Personnel, equipment, and materials needed for the construction

7. Construction Methodology: Step-by-step procedures for cofferdam installation, including sequence of works

8. Quality Control Measures: Inspection and testing requirements during construction

9. Safety Requirements: Safety procedures, PPE requirements, and risk assessment

10. Environmental Management: Measures to protect environment and manage water pollution

11. Monitoring Requirements: Procedures for monitoring cofferdam stability and water levels

12. Emergency Response Plan: Procedures for handling emergencies such as flooding or structural issues

What sections are optional to include in a Cofferdam Construction Method Statement?

1. Temporary Works Design: Detailed design calculations and drawings for temporary works, required for complex cofferdam structures

2. Dewatering Plan: Specific procedures for dewatering, required when groundwater management is critical

3. Traffic Management: Required when cofferdam construction affects public roads or site access

4. Noise Control Measures: Required for urban areas or noise-sensitive environments

5. Interface Management: Required when working adjacent to other contractors or existing structures

6. Winter Working Measures: Required for projects extending into monsoon season

What schedules should be included in a Cofferdam Construction Method Statement?

1. Appendix A - Risk Assessment: Detailed risk assessment matrices and control measures

2. Appendix B - Construction Drawings: Detailed drawings showing cofferdam layout, sections, and details

3. Appendix C - Calculation sheets: Design calculations and analysis results

4. Appendix D - Inspection Checklists: Quality control and safety inspection forms

5. Appendix E - Emergency Contact List: List of key personnel and emergency services contacts

6. Appendix F - Equipment Specifications: Technical specifications of major equipment to be used

7. Appendix G - Environmental Monitoring Forms: Templates for environmental monitoring and reporting

8. Appendix H - Method Statement Review Form: Form for reviewing and approving method statement changes

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Malaysia

Publisher

ֱ

Document Type

Method Statement

Cost

Free to use

Find the exact document you need

Method Statement For Cutting Concrete Slab

A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Malaysian construction and safety regulations.

Download

Cofferdam Construction Method Statement

A Malaysian-compliant technical document outlining the methodology and safety procedures for cofferdam construction, following DOSH and CIDB requirements.

Download

Method Statement For Column Formwork

A technical document outlining procedures and requirements for column formwork installation in Malaysian construction projects, complying with local regulations and standards.

Download

Method Statement For Demolition Of Concrete Slab

A Malaysian-compliant technical document outlining safe and regulated procedures for concrete slab demolition works.

Download

Risk Assessment And Method Statement

A Malaysian-compliant safety document combining risk assessment and detailed work procedures, meeting DOSH requirements for workplace safety management.

Download

Aluminium Formwork Method Statement

A technical document detailing aluminum formwork installation procedures and safety requirements for construction projects in Malaysia, compliant with local regulations and standards.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it