ֱ

Aluminium Formwork Method Statement Template for Philippines

A comprehensive technical document outlining the procedures, safety measures, and quality control requirements for aluminum formwork operations in construction projects within the Philippines. This document adheres to Philippine construction regulations, including DOLE Department Order No. 13, the National Building Code (PD 1096), and local building authority requirements. It provides detailed guidelines for the safe and efficient installation, use, and dismantling of aluminum formwork systems, incorporating specific requirements for Philippine construction practices and environmental conditions.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With ֱ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Aluminium Formwork Method Statement?

The Aluminum Formwork Method Statement is a critical document required for construction projects in the Philippines that utilize aluminum formwork systems. This document should be prepared before commencing any formwork operations and must comply with Philippine construction regulations, including DOLE safety standards and the National Building Code. The method statement details the complete procedure for handling, installing, and dismantling aluminum formwork, incorporating safety protocols, quality control measures, and specific requirements for local construction practices. It serves as a primary reference for construction teams and is particularly important for high-rise construction projects where aluminum formwork systems are commonly used. The document must be aligned with local building authority requirements and should be updated as needed to reflect any changes in construction methodology or safety requirements.

What sections should be included in a Aluminium Formwork Method Statement?

1. 1. Project Information: Overview of the project, including project name, location, and key stakeholders

2. 2. Scope of Work: Detailed description of the aluminum formwork activities to be carried out

3. 3. Reference Documents: List of applicable codes, standards, and specifications

4. 4. Material Specifications: Details of aluminum formwork components, accessories, and required materials

5. 5. Equipment Requirements: List of tools, machinery, and equipment needed for formwork operations

6. 6. Safety Requirements: Comprehensive safety measures, PPE requirements, and risk assessment

7. 7. Pre-installation Requirements: Site preparation, storage, and handling of formwork components

8. 8. Installation Procedure: Step-by-step process for assembling and installing aluminum formwork

9. 9. Quality Control Measures: Inspection points, tolerances, and quality assurance procedures

10. 10. Concrete Pouring Procedure: Methods and precautions for concrete placement

11. 11. Striking Procedure: Process for safe removal and dismantling of formwork

12. 12. Cleaning and Maintenance: Procedures for cleaning, maintaining, and storing formwork components

What sections are optional to include in a Aluminium Formwork Method Statement?

1. Special Weather Considerations: Additional procedures for extreme weather conditions - include for projects in areas with severe weather

2. High-Rise Specific Procedures: Special considerations for high-rise buildings - include for buildings over 10 stories

3. Architectural Finish Requirements: Special procedures for achieving specific architectural finishes - include for projects with exposed concrete requirements

4. Alternative Methods: Backup procedures and alternative methods - include for complex projects with potential execution challenges

5. Interface with Other Works: Coordination procedures with other trades - include for projects with complex MEP integration

What schedules should be included in a Aluminium Formwork Method Statement?

1. Appendix A: Risk Assessment: Detailed risk assessment matrix for all formwork operations

2. Appendix B: Inspection Checklists: Pre-pour, during pour, and post-pour inspection checklists

3. Appendix C: Equipment Specifications: Detailed specifications of all required equipment and tools

4. Appendix D: Component Details: Technical drawings and specifications of formwork components

5. Appendix E: Safety Permits: Templates for required safety permits and clearances

6. Appendix F: Emergency Procedures: Emergency response procedures and contact information

7. Appendix G: Quality Control Forms: Standard forms for quality control and documentation

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Philippines

Publisher

ֱ

Document Type

Method Statement

Cost

Free to use

Find the exact document you need

Cofferdam Construction Method Statement

A technical document outlining cofferdam construction methodology and safety procedures in compliance with Philippine regulations and standards.

Download

Method Statement For Column Formwork

A technical document outlining column formwork procedures and requirements in accordance with Philippines construction regulations and safety standards.

Download

Aluminium Formwork Method Statement

A technical document outlining aluminum formwork procedures and safety requirements under Philippine construction regulations.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it