ֱ

Risk Assessment And Method Statement Template for Singapore

Create a bespoke document in minutes, or upload and review your own.

4.6 / 5
4.8 / 5

Let's create your Risk Assessment And Method Statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Get your first 2 documents free

Your data doesn't train Genie's AI

You keep IP ownership of your information

Key Requirements PROMPT example:

Risk Assessment And Method Statement Template

I need a Risk Assessment And Method Statement Template Free for a construction project involving high-rise building maintenance in Singapore, specifically focusing on working at heights and crane operations, to be implemented by March 2025.

Your data doesn't train Genie's AI

You keep IP ownership of your information

Generate a Bespoke Document

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Download a Standard Template

4.6 / 5
4.8 / 5
Access for free
OR

What is a Risk Assessment And Method Statement?

The Risk Assessment And Method Statement Template is a crucial document required under Singapore's workplace safety regulations. It serves as a systematic approach to identifying and controlling workplace hazards before work begins. The template is designed to comply with the Workplace Safety and Health Act and related regulations, providing a structured methodology for risk assessment, control measures, and safe work procedures. This document is essential for companies operating in Singapore to demonstrate due diligence in workplace safety management and maintain compliance with local regulatory requirements.

What sections should be included in a Risk Assessment And Method Statement?

1. Project Information: Details of the project, location, scope of work, and key stakeholders

2. Risk Assessment Team: Names, qualifications, and roles of personnel conducting the assessment

3. Hazard Identification: Systematic identification and listing of all potential hazards in the workplace

4. Risk Evaluation Matrix: Assessment of likelihood and severity of risks using standardized risk matrix

5. Control Measures: Detailed preventive and protective measures to eliminate or minimize identified risks

6. Safe Work Procedures: Step-by-step procedures for safely completing tasks with identified risks

What sections are optional to include in a Risk Assessment And Method Statement?

1. Chemical Handling Procedures: Specific procedures and precautions for handling hazardous substances and chemicals

2. Working at Heights Assessment: Detailed assessment and procedures for work conducted above 2 meters height

3. Confined Space Entry: Special procedures and precautions for work in confined spaces

4. Heavy Machinery Operation: Specific procedures for operating heavy machinery and equipment

5. Environmental Impact Assessment: Assessment of environmental risks and mitigation measures

What schedules should be included in a Risk Assessment And Method Statement?

1. Risk Assessment Forms: Standardized templates for documenting risk assessments and evaluations

2. Emergency Response Plans: Detailed procedures and contact information for various emergency scenarios

3. Training Records: Documentation of worker training, certifications, and competency assessments

4. PPE Requirements Chart: Comprehensive list of required personal protective equipment for different tasks

5. Incident Reporting Forms: Standard forms and procedures for reporting safety incidents and near-misses

6. Legislative Compliance Checklist: Checklist ensuring compliance with Singapore workplace safety regulations

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents | Serial Founder & Legal AI Author

Relevant legal definitions








































Clauses




























Industries

Workplace Safety and Health Act (WSHA): Primary legislation governing workplace safety and health in Singapore, providing the framework for regulating safety standards across all industries

Workplace Safety and Health (Risk Management) Regulations: Specific regulations detailing requirements for conducting risk assessments and implementing risk management systems in workplaces

Workplace Safety and Health (General Provisions) Regulations: General regulations covering basic workplace safety requirements applicable across different industries

Code of Practice on Workplace Safety and Health Risk Management: Practical guidelines and standards for implementing risk management processes in accordance with WSH regulations

Technical Advisories from Ministry of Manpower: Official guidance documents providing specific safety requirements and best practices for various workplace scenarios

Singapore Standards (SS): National standards providing detailed technical specifications and guidelines for industry-specific safety requirements

Construction Regulations: Specific regulations governing safety requirements in the construction industry, including building works and construction site management

Manufacturing Safety Requirements: Specific safety standards and procedures applicable to manufacturing operations and processes

Chemical Handling Regulations: Requirements for safe storage, handling, and disposal of chemicals in workplace environments

Environmental Protection and Management Act: Legislation governing environmental protection aspects that may impact workplace safety and health procedures

Fire Safety Act: Requirements for fire safety measures and emergency procedures in workplaces

Work Injury Compensation Act: Legal framework for compensation in case of work-related injuries, influencing risk assessment considerations

ISO 45001: International standard for Occupational Health and Safety Management Systems, providing guidelines for systematic safety management

Teams

Employer, Employee, Start Date, Job Title, Department, Location, Probationary Period, Notice Period, Salary, Overtime, Vacation Pay, Statutory Holidays, Benefits, Bonus, Expenses, Working Hours, Rest Breaks,  Leaves of Absence, Confidentiality, Intellectual Property, Non-Solicitation, Non-Competition, Code of Conduct, Termination,  Severance Pay, Governing Law, Entire Agreemen

Find the exact document you need

Workplace Violence Risk Assessment

A Singaporean legal document assessing workplace violence risks to ensure compliance with safety and health regulations.

find out more

Workplace Violence And Harassment Risk Assessment

A Singapore legal document assessing workplace violence and harassment risks under local safety and harassment laws.

find out more

Warehouse Risk Assessment

A Singaporean legal document assessing warehouse risks to ensure compliance with workplace safety regulations.

find out more

Threat Vulnerability Risk Assessment

A Singaporean framework for assessing security compliance with local regulations and international standards.

find out more

Third Party Risk Assessment

A Singaporean legal template for assessing and managing third-party risks, ensuring regulatory compliance and oversight.

find out more

System Risk Assessment

A Singaporean framework for evaluating technological risks, ensuring compliance with Cybersecurity Act 2018 and PDPA 2012.

find out more

Travel Risk Assessment

A Singapore legal document ensuring compliance with travel risk management and employee safety during business trips.

find out more

Stress Risk Assessment

A Singaporean legal document assessing workplace stress risks to ensure compliance with safety and mental health laws.

find out more

Step Ladder Risk Assessment

A Singapore safety document assessing and managing stepladder use risks in workplace environments.

find out more

Shop Risk Assessment

A Singaporean legal document for assessing and managing retail workplace safety risks.

find out more

Risk Benefit Assessment

A Singaporean template assessing workplace risks and benefits, ensuring compliance with safety regulations.

find out more

Risk Assessment Form

A Singaporean legal document for identifying and managing workplace safety hazards and risks.

find out more

Risk Assessment And Method Statement

A Singaporean document ensuring compliance with workplace safety regulations through risk assessment and control measures.

find out more

Pregnancy Risk Assessment

A Singaporean legal document assessing workplace risks and modifications for pregnant employees under safety regulations.

find out more

Pest Risk Assessment

A Singaporean legal document for assessing and managing pest risks in compliance with environmental and health standards.

find out more

Outdoor Risk Assessment

A Singaporean legal document assessing outdoor activity risks, ensuring compliance with workplace safety regulations.

find out more

IT Project Risk Assessment

A Singaporean legal document for assessing IT project risks, ensuring compliance with PDPA and Cybersecurity Act.

find out more

Infection Control Risk Assessment

A Singaporean legal document for systematic infection risk assessment and compliance with health regulations.

find out more

Hot Work Risk Assessment

A Singaporean legal document assessing risks and controls for hot work activities to ensure workplace safety compliance.

find out more

Hazardous Chemical Risk Assessment

A Singaporean legal document assessing and managing workplace risks from hazardous chemicals for safety compliance.

find out more

Hazard Assessment

A Singaporean document for identifying workplace hazards and implementing safety measures under the Workplace Safety and Health Act.

find out more

Legal Risk Assessment

A Singaporean legal document for assessing organizational legal risks and compliance obligations.

find out more

Functional Risk Assessment

A Singaporean legal document guiding workplace hazard identification and risk management compliance.

find out more

Forklift Risk Assessment

A Singaporean safety document assessing forklift operation risks and ensuring compliance with local workplace safety standards.

find out more

Food Safety Risk Assessment

#N/A

find out more

Food Defense Threat Assessment

#N/A

find out more

First Aid Risk Assessment

A Singaporean legal document assessing workplace first aid needs under safety regulations.

find out more

Firm Risk Assessment

A Singaporean legal document for comprehensive organizational risk assessment and regulatory compliance management.

find out more

Finance Risk Assessment

A Singaporean financial document assessing risk exposure for compliance with MAS regulations and risk management practices.

find out more

Exposure Assessment

A Singaporean document for evaluating workplace exposure risks under the Workplace Safety and Health Act.

find out more

Empty Risk Assessment

A Singaporean legal document standardizing workplace risk assessments for safety compliance and regulatory adherence.

find out more

Anti Bribery And Corruption Risk Assessment

A Singaporean compliance document assessing anti-corruption risks and aligning with local and international regulations.

find out more

Church Risk Assessment

A Singaporean legal document assessing church safety compliance with regulatory and emergency procedures.

find out more

Chemistry Risk Assessment

A Singaporean legal document for assessing and managing chemical risks in workplace safety compliance.

find out more

Laboratory Risk Assessment Form

A mandatory safety documentation tool under Singapore law for evaluating and controlling laboratory hazards.

find out more

IT Risk Assessment Form

A Singapore-compliant document for evaluating and documenting IT system risks and security measures under local regulatory frameworks.

find out more

Client Risk Assessment Form

A regulatory document used in Singapore to assess and document client risk profiles in compliance with MAS requirements.

find out more

Security Risk Assessment Form

A Singapore-compliant document for evaluating and documenting organizational security risks and controls under local regulatory requirements.

find out more

Maintenance Risk Assessment Worksheet

A regulatory-compliant worksheet for assessing and documenting maintenance-related risks under Singapore's Workplace Safety and Health framework.

find out more

Information Security Risk Assessment Form

A standardized form for evaluating information security risks in Singapore, aligned with local data protection and cybersecurity regulations.

find out more

Vendor Risk Assessment Form

A standardized form used in Singapore for evaluating potential risks associated with third-party vendors, ensuring compliance with local regulations and security requirements.

find out more

Manual Handling Assessment Form

A standardized form used in Singapore for assessing and documenting risks associated with workplace manual handling tasks, in compliance with local safety regulations.

find out more

Garage Risk Assessment Form

A regulatory-compliant risk assessment document for garage facilities in Singapore, evaluating workplace hazards and control measures under WSH regulations.

find out more

Plant Risk Assessment Form

A mandatory safety documentation tool under Singapore law for assessing and managing risks associated with plant and machinery in workplaces.

find out more

Deliberate Risk Assessment Worksheet

A structured risk assessment document compliant with Singapore's Workplace Safety and Health regulations for identifying and controlling workplace hazards.

find out more

Filming Risk Assessment Form

A mandatory safety assessment document for film production in Singapore, identifying and addressing potential filming hazards in compliance with local regulations.

find out more

Environmental Risk Assessment Form

A mandatory environmental risk evaluation document under Singapore's environmental regulations for assessing and managing potential environmental impacts of projects.

find out more

Cyber Security Assessment Form

A Singapore-compliant document for evaluating organizational cybersecurity posture and regulatory compliance.

find out more

Ppe Hazard Assessment Form

A Singapore-compliant workplace safety document for assessing hazards and determining required personal protective equipment under MOM regulations.

find out more

Activity Based Risk Assessment Form

A Singapore-compliant workplace safety document that evaluates and controls risks for specific activities under MOM guidelines.

find out more

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

Our bank-grade security infrastructure undergoes regular external audits

We are ISO27001 certified, so your data is secure

Organizational security

You retain IP ownership of your documents

You have full control over your data and who gets to see it

Innovation in privacy:

Genie partnered with the Computational Privacy Department at Imperial College London

Together, we ran a £1 million research project on privacy and anonymity in legal contracts

Want to know more?

Visit our for more details and real-time security updates.