Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. 1. Purpose and Scope: Defines the purpose of the method statement and scope of formwork activities
2. 2. Reference Documents: Lists applicable codes, standards, and specifications
3. 3. Definitions: Key terms and technical definitions used in the document
4. 4. Responsibilities: Defines roles and responsibilities of key personnel
5. 5. Resources: Details of manpower, equipment, and materials required
6. 6. Safety Requirements: Mandatory safety measures, PPE requirements, and precautions
7. 7. Pre-work Activities: Site preparation, material inspection, and prerequisite checks
8. 8. Work Methodology: Step-by-step procedure for formwork installation and removal
9. 9. Quality Control: Inspection points, tolerances, and acceptance criteria
10. 10. Emergency Procedures: Response procedures for potential emergencies
11. 11. Environmental Controls: Environmental protection measures and waste management
1. Special Architectural Requirements: Include when columns have special architectural features or finishes
2. Concrete Placement Method: Include when specific concrete placement methods affect formwork design
3. Winter/Summer Working: Include specific measures for extreme weather conditions
4. Interface Management: Include when work interfaces with other critical activities
5. Post-tensioning Requirements: Include for post-tensioned concrete columns
6. Monitoring Requirements: Include for critical structures requiring special monitoring
1. Appendix A - Risk Assessment: Detailed risk assessment for formwork activities
2. Appendix B - Inspection Checklist: Quality control and safety inspection checklists
3. Appendix C - Equipment Specifications: Technical specifications of formwork system and components
4. Appendix D - Method Statement Drawings: Detailed drawings showing formwork assembly and details
5. Appendix E - Emergency Contact List: List of emergency contacts and response team
6. Appendix F - Training Records: Certificates and training records of key personnel
7. Appendix G - Material Specifications: Specifications for formwork materials and accessories
Find the exact document you need
Method Of Statement For Cable Termination
A technical procedure document for cable termination works in the UAE, compliant with local electrical regulations and safety standards.
Method Statement For Column Formwork
A technical document outlining methodology and safety requirements for column formwork operations in UAE construction projects, ensuring compliance with local regulations and international standards.
Method Statement For Demolition Of Concrete Slab
UAE-compliant technical document detailing methodology and safety procedures for concrete slab demolition works.
Aluminium Formwork Method Statement
A UAE-compliant technical procedure document for aluminum formwork operations in construction projects, adhering to local regulations and international standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
