Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Project Information: Details of the project location, scope, and parties involved
2. Scope of Works: Detailed description of the demolition works to be undertaken
3. Site Organization: Site layout, access points, storage areas, and welfare facilities
4. Resource Requirements: List of personnel, equipment, and materials needed for the demolition
5. Risk Assessment: Identification and assessment of potential hazards and control measures
6. Method of Demolition: Step-by-step procedure for concrete slab demolition
7. Safety Measures: Specific safety procedures and PPE requirements
8. Environmental Protection Measures: Dust control, noise reduction, and waste management procedures
9. Quality Control: Inspection and verification procedures during demolition
10. Emergency Procedures: Response plans for potential emergency situations
1. Temporary Works: Details of any temporary support structures required, used when demolition affects structural stability
2. Traffic Management Plan: Required when demolition impacts public roads or requires vehicle movement planning
3. Noise Management Plan: Detailed procedures for noise control, required in noise-sensitive areas
4. Vibration Monitoring: Procedures for monitoring vibration levels, needed when near sensitive structures
5. Utility Protection: Procedures for protecting existing utilities, required when live services are present
6. Public Protection Measures: Additional safety measures when working near public areas
1. Schedule A - Site Layout Plan: Detailed drawings showing site organization and work zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment tables and control measures
3. Schedule C - Equipment Schedule: List of equipment with specifications and certifications
4. Schedule D - Training Records: Certificates and qualifications of key personnel
5. Schedule E - Inspection Checklists: Forms for daily safety and quality inspections
6. Schedule F - Emergency Contact List: List of emergency contacts and responsible persons
7. Appendix 1 - Method Statement Briefing Record: Record of worker briefings on the method statement
8. Appendix 2 - Permits and Licenses: Copies of relevant permits and authorizations
9. Appendix 3 - Safety Data Sheets: Safety information for any hazardous materials
Find the exact document you need
Method Of Statement For Cable Termination
A technical procedure document for cable termination works in the UAE, compliant with local electrical regulations and safety standards.
Method Statement For Column Formwork
A technical document outlining methodology and safety requirements for column formwork operations in UAE construction projects, ensuring compliance with local regulations and international standards.
Method Statement For Demolition Of Concrete Slab
UAE-compliant technical document detailing methodology and safety procedures for concrete slab demolition works.
Aluminium Formwork Method Statement
A UAE-compliant technical procedure document for aluminum formwork operations in construction projects, adhering to local regulations and international standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
